About This Reference

An independent reference on oilfield water disposal in southern Alberta. Not an operator, not affiliated with one.

Southern Alberta prairie landscape with oilfield tank batteries and a gravel lease road under a wide sky at golden hour

This site is a reference publication about oilfield produced water disposal in the Taber region and southern Alberta more broadly. It explains how disposal and injection wells work, how Alberta classifies and regulates them, what happens to waste oil and solids, and what operators are actually required to do.

What this site is not

We want to be blunt about this because the domain name invites the assumption. We are not a disposal operator. We do not own or run disposal wells or receiving facilities. We do not accept waste, haul it, quote for it, or arrange it. We are not affiliated with, endorsed by, or connected to any disposal company, including any business that previously used this domain name.

If you have arrived here looking to book a load or arrange service, we genuinely cannot help, and the right move is to contact a licensed Alberta operator directly. If you have a regulatory question, the Alberta Energy Regulator is the authority, not us.

Why the site exists

Writing about this subject tends to come in two flavours. There is vendor material, which is careful not to say anything specific enough to be held to. And there are the regulatory directives themselves, which are authoritative but written for people who already understand the framework they sit inside.

What is missing is the middle: an explanation accurate enough to be useful and plain enough to be read by someone who is not a petroleum engineer. A field operator trying to understand why a load was rejected, a small producer working out whether a disposal well is worth drilling, a landowner wanting to know what the well on their quarter section actually does — none of them are well served at the moment.

Who writes it

Dale Whitcombe spent eighteen years in production operations and water handling on southern Alberta leases before writing full time. He covers field practice: what happens at a facility gate, why loads get rejected, how water systems are actually run. He is not a professional engineer and does not give engineering advice.

Priya Raman researches and writes the regulatory material, tracking AER directives and translating them into something a field operator can act on. She edits and sources every guide before publication. She is not a lawyer and does not give legal or compliance advice.

How we handle accuracy

Where we state a requirement, we name the directive it comes from, so that you can check the current version yourself. Requirements in this area are revised more often than most operators notice, so every guide carries a last-reviewed date and every regulatory page carries a note telling you to verify before relying on it. That is not a disclaimer for its own sake; it is the honest position for a reference site writing about a moving target.

Our fact-checking policy covers how claims are verified and how to report an error. We correct things, and we date the correction.

Contact

Corrections and regulatory updates we have missed are welcome through the contact page. Service enquiries are not something we can act on.

Our authors

Dale Whitcombe

Field Operations Writer & Founding Editor

Dale spent eighteen years working production and water handling on leases across southern Alberta before moving into writing full time. He covers day-to-day field practice: what happens at a facility gate, why loads get rejected, and how operators actually run water systems rather than how a manual says they should.

Priya Raman

Regulatory Researcher & Editor

Priya researches and writes the regulatory side of this reference, tracking AER directives and provincial waste rules and translating them into something a field operator can act on. She edits and sources every guide before it is published.